Separate generated action horizon, executed prefix and replanning interval.

Explore in AtlasMathematical, data and behavior space; logical dimensions are not physical distance

Learning objectiveSeparate generated action horizon, executed prefix and replanning interval.

The mechanism

A diffusion action policy generates a sequence of future commands conditioned on observations. Receding-horizon execution applies only a prefix, then receives new observations and generates another sequence. The prediction horizon and action-execution horizon are therefore different parameters. Executing a longer prefix reduces replanning frequency but delays reactions to disturbances. Inference latency also consumes part of the control budget and must be measured or explicitly assumed. Diffusion Policy studies this structure; the scalar command sequence here is a worked control trace, not a trained denoising policy.

  1. Record the observation time and generate an action chunk under a declared policy identity.
  2. Execute only the selected prefix with an explicit command/period convention.
  3. Observe disturbances and update the next planning state.
  4. Compare closed-loop and open-loop outcomes while separating assumed inference delay from actual transition arithmetic.

Science and assumptions

Predict action chunks and replan with feedback · worked relation

Tprefix=Haf,xt+1=xt+at+dtT_{prefix}=\frac{H_a}{f},\qquad x_{t+1}=x_t+a_t+d_t

Separate generated action horizon, executed prefix and replanning interval.

Symbols and units
T_prefix
Time covered by executed action prefix

s

H_a
Executed commands before replanning

commands

f
Command rate

commands per s

x_t
Position

m

a_t
Position increment command

m per step

d_t
Disturbance at the declared step

m

For xnext=x+ax_{\mathrm{next}}=x+a, start x=0 and an authored chunk [1,1,1,1] targeting x=4. After executing the first command, a disturbance adds +1, so observed x=2. Replanning with [1,1,0,0] and executing the next two commands reaches 4. Executing all three remaining original commands instead reaches 5. At an assumed 10 Hz command rate, a two-command prefix covers 0.2 s; an assumed 0.05 s inference delay is one quarter of that interval, not a measured policy latency.

Assumptions Authored deterministic scalar integrator and command chunks. Rate and delay are stated assumptions; no diffusion inference or physical robot timing is measured.

Engineering example

For xnext=x+ax_{\mathrm{next}}=x+a, start x=0 and an authored chunk [1,1,1,1] targeting x=4. After executing the first command, a disturbance adds +1, so observed x=2. Replanning with [1,1,0,0] and executing the next two commands reaches 4. Executing all three remaining original commands instead reaches 5. At an assumed 10 Hz command rate, a two-command prefix covers 0.2 s; an assumed 0.05 s inference delay is one quarter of that interval, not a measured policy latency.

Distinctions and tradeoffs

It is a mistake to conclude: The original chunk becomes guaranteed correct.

Frequent replanning improves responsiveness but spends more inference work. Long prefixes tolerate delay while increasing open-loop exposure to model and environment error.

Distinguish predicting observations, choosing actions and controlling a changing environment. Separate generated action horizon, executed prefix and replanning interval.

Specifications and interfaces

Learning mode
worked example

The executable decoder has 423 parameters; worked extensions do not imply an additional simulator.

Worked contract
Separate generated action horizon, executed prefix and replanning interval.

Authored deterministic scalar integrator and command chunks. Rate and delay are stated assumptions; no diffusion inference or physical robot timing is measured.

Interfaces

Inputs and state Input
Record the observation time and generate an action chunk under a declared policy identity.
Result and check Output
Separate generated action horizon, executed prefix and replanning interval.

Check your understanding

What changes when only a prefix is executed before observing again?

  1. The next commands can be replanned from the disturbed state.
  2. The original chunk becomes guaranteed correct.
  3. The policy’s weights must be retrained after every command.
Answer and reasoning

The next commands can be replanned from the disturbed state.

The next commands can be replanned from the disturbed state. Authored deterministic scalar integrator and command chunks. Rate and delay are stated assumptions; no diffusion inference or physical robot timing is measured.

Evidence and scope

Mode: worked example. Authored deterministic scalar integrator and command chunks. Rate and delay are stated assumptions; no diffusion inference or physical robot timing is measured. Numerical examples are authored calculations, except explicitly identified automated core fixtures. Primary sources support the scoped mechanism; no human specialist review or learner outcome is implied.

Model lifecycle studio: worked example. Authored deterministic scalar integrator and command chunks. Rate and delay are stated assumptions; no diffusion inference or physical robot timing is measured.

Sources

Published lesson data · Atlas releases and licensing

Continue exploring

Foundations

Related lessons