{"id":"power-supply","level":"server","name":"Power supply and power shelf","shortName":"PSU","role":"Converts facility power into the regulated DC distribution used by the compute rack.","description":"A power supply converts incoming electrical power into a form the equipment can distribute and use. Rack systems combine several supplies in shelves, sharing load and providing redundancy. A shelf’s installed nameplate capacity is not the same as the power continuously consumed by the rack, especially when redundant capacity is reserved. Efficiency also varies with load, and conversion loss becomes heat that must be removed. Facility input passes through supplies into DC distribution and then downstream regulation, with losses and capacity limits at each boundary. A failure scenario can remove one supply path while the remaining capacity carries the load, making reliability tangible. Supply counts and redundancy arrangements belong to the named rack configuration, not to a universal power-chain diagram.","specs":[{"label":"DGX GB200 PSU example","value":"5.5 kW per PSU","context":"NVIDIA DGX hardware guide configuration."},{"label":"Shelf example","value":"6 PSUs / 33 kW per shelf","context":"Installed shelf rating, not a single processor’s power."},{"label":"DGX rack power","value":"Approximately 120 kW","context":"Published rack consumption example; configuration and operating workload matter."}],"interfaces":[{"name":"Facility electrical input","direction":"in","signal":"AC supply to conversion stages"},{"name":"DC distribution","direction":"out","signal":"Power to busbars and downstream regulators"},{"name":"Telemetry/control","direction":"out","signal":"Status, power readings, and fault information"}],"tradeoff":"Redundancy improves availability but adds installed hardware beyond the active load requirement. Conversion efficiency, airflow, and service access affect the practical rack design.","whyAI":"Large AI systems are constrained by deliverable electrical power as well as chip count. Power shelves turn facility capacity into a controlled supply that accelerators can actually consume.","related":["voltage-regulator","compute-baseboard","management-controller","power-shelf"],"sources":[{"title":"NVIDIA DGX GB rack systems hardware guide","url":"https://docs.nvidia.com/dgx/dgxgb200-user-guide/hardware.html"},{"title":"NVIDIA DGX GB200 SuperPOD reference components","url":"https://docs.nvidia.com/dgx-superpod/reference-architecture-scalable-infrastructure-gb200/latest/dgx-superpod-components.html"}],"scale":"Rack shelf scale with multiple centimeter-scale supply modules","kind":"redundant-power-conversion","mechanism":["Incoming facility power is converted into the DC supply used by the rack distribution system.","Multiple power modules share the load, with extra capacity arranged according to the required redundancy strategy.","DC power feeds downstream regulators, while telemetry and protection respond to changing demand or faults."],"misconception":"Installed PSU capacity is not the rack’s constant power consumption. Redundancy reserves capacity, and actual load depends on equipment and operating workload.","check":{"question":"Why can a rack have more installed PSU capacity than its normal consumption?","options":["Some capacity is reserved for redundancy and operating margin.","The unused rating proves the rack consumes no electricity.","Power supplies permanently store spare compute instructions."],"answer":0,"explanation":"Redundant designs preserve enough capacity when a supply path fails or is serviced. The installed rating and active consumption therefore describe different things."},"branch":"Power delivery","subbranch":"Electrical conversion","science":[{"title":"Conversion loss becomes a cooling load","equation":"η = Pout/Pin; Ploss = Pout × (1/η − 1)","explanation":"Efficiency η relates useful DC output power to electrical input. The difference is dissipated in the conversion system. At large rack loads, even a small efficiency change can alter the heat that power shelves and facility cooling must remove. Installed redundant capacity is a separate concept: it changes the available power paths, not this conservation-of-energy accounting.","assumptions":"Steady average power at explicitly chosen input and output boundaries. Efficiency depends on voltage, load, and operating conditions; other rack and facility losses are outside a supply-only calculation."}],"history":[],"prerequisites":["voltage-regulator"],"learningObjective":"Account for input power and conversion loss at a stated supply efficiency.","engineeringExample":"Synthetic supply delivering 3 kW at 96% efficiency draws 3/0.96 = 3.125 kW and loses 0.125 kW = 125 W. That heat belongs to the supply boundary; it is additional to the 3 kW delivered downstream.","evidenceNotes":"The efficiency identity is independent of brand. Values are synthetic, and real efficiency varies with input, load and temperature; distribution, regulator and facility losses must be accounted for at their own boundaries.","labId":"library","scope":"No current calculator directly models this lesson’s main mechanism. Use the library for related bounds while retaining their stated omissions.","investigationId":"manufacturing","labScope":"No current calculator directly models this lesson’s main mechanism. Use the library for related bounds while retaining their stated omissions."}